Proyecto: Urbanismo 1_2025 / Urban Design 1_2025
Tema: 4. proyecto urbano y arquitectura | URBAN AND ARCHITECTURAL PROJECT
Coordinadores:
abarca
ferospe
falvarez
.
PROPOSED SOLUTION: The solution involves relocating through traffic to a parallel road and fundamentally restructuring the street network by shifting the main artery away from the waterfront. This creates space for new recreational green areas and services. The area will be densified with perimeter-block residential buildings along the new main street, mirroring the existing urban fabric on the opposite side. A key priority is the prioritization of public transport through the introduction of a new tram line. Simultaneously, cycling will be prioritized along the waterfront with a dedicated, fast, and attractive bicycle route connecting the riverbanks. Pedestrian movement along the water will also be enhanced, creating an attractive, continuous promenade with improved walking access to the city center. The final outcome will be the creation of new, vibrant green spaces dedicated to public recreation.
Aún no hay comentarios para esta entrada. ¡Sé el primero!
Accede o regístrate para comentar y puntuar la entrada.